I am trying to work out how to iterate over nested variables from a complex object given in the following tfvars file using Terraform 0.12.10:
example.tfvars
virtual_network_data = {
1 = {
product_instance_id = 1
location = "somewhere"
address_space = ["192.168.0.0/23"]
dns_servers = []
custom_tags = {"test":"test value"}
subnets = [
{
purpose = "mgmt"
newbits = 4
item = 0
},
{
purpose = "transit"
newbits = 4
item = 1
}
]
}
}
example.tf
variable "virtual_network_data" {} #Data comes from example.tfvars
variable "resource_group_name" {
default = "my_resource_group"
}
variable "virtual_network_name" {
default = "my_virtual_network"
}
####
resource "azurerm_subnet" "pool" {
for_each = var.virtual_network_data
name = format("%s%s%02d", "subnet_", s.purpose, s.item)
resource_group_name = var.resource_group_name
virtual_network_name = var.virtual_network_name
address_prefix = cidrsubnet(each.value["address_space"], s.newbits, s.item)
}
In example.tf I can use each.value["address_space"] to get to the top level variables, but I can't work out how to get to the items in subnets (s.purpose, s.item & s.newbits).
I have used dynamic blocks, as part of a parent resource (below), which works but in this case, I need to move the subnet into its own resource. Simply put, how do I get the first for_each to behave like the second for_each in the dynamic block?
resource "azurerm_virtual_network" "pool" {
for_each = var.virtual_network_data
name = format("%s%02d", local.resource_name, each.key)
resource_group_name = var.resource_group_name
location = each.value["location"]
address_space = each.value["address_space"]
dns_servers = each.value["dns_servers"]
tags = merge(local.tags, each.value["custom_tags"])
dynamic "subnet" {
for_each = [for s in each.value["subnets"]: {
name = format("%s%s%02d", "subnet_", s.purpose, s.item)
prefix = cidrsubnet(element(each.value["address_space"],0), s.newbits, s.item)
}]
content {
name = subnet.value.name
address_prefix = subnet.value.prefix
}
}
}
Cheeky bonus, is there a way to replace s.item with something like each.key or count.index?
TIA