I am trying to shape a JMeter test involving a Concurrency Thread Group
and a Throughput Shaping Timer
as documented here and here. the timer is configured to run ten ramps and stages with RPS from 1 to 333.
I want to set up the Concurrency Thread Group to use the schedule feedback function and added the formula in the Target concurrency field (I have updated the example from tst-name to the actual timer name). ramp-up time and steps I have set to 1 as I assume the properties are not that important if the throughput is managed by the timer; the Hold Target Rate time is 8000, which is longer than the steps added in the timer (6200).
When I run the test, it ends without any exceptions within 3 seconds or so. The log file shows a few rows about starting and ending threads but nothing alarming.
The only thing I find suspicious is the Log entry "VirtualUserController: Test limit reached, thread is done
plus thread name.
I am not getting enough clues from the documentation linked here to figure this out myself, do you have any hints?