I am asked to install IBM Business Process Manager (BPM) 8.5.6 on a Linux box in a silent mode, meaning no GUI and only through command line and response files. a) Do i need to install the Installation Manager first? b) All the Linux pre requisites setup are done c) Do I need to install Websphere Application Server (WAS) before installing BPM? d) Please help me to setup IBM BPM using step by step guide. (installation and BPMConfig) Note: I tried to look at IBM info center. Those instructions are confusing with lot of Database related information. We have a dedicated SQL server DBA to setup the Database for us.
Thanks, Kumar.