I am planning my migration from TFS 2010 to TFS 2013. I am using the guide at http://vsarupgradeguide.codeplex.com/downloads/get/755804#
Currently my TFS 2010 server has a reporting services instance installed with the required databases:
- Tfs_Warehouse
- Tfs_Analysis
- ReportServer
- ReportServerTempDb
Can I migrate to a new TFS 2013 server without backing up / restoring the reporting services? Basically not installing reporting services and then just later on installing a new instance of reporting services?
Will this work or will the migration process fail? Will I lose any functionality if I do it this way?