One of my bright ideas is looking a little less bright than I first thought.
Background - I needed to do the classic repeat control solution to the view with DBLookups in one of the columns. I need to have totals for the columns, so I decided that I would use a viewScope variable to hold the subtotal, and add the values as I compute them in the rows of the repeat control.
Sounds good in theory, but for some reason, if I use a Computed Field inside the repeat control, the value is computed (and appended to the subtotal) twice. I have established this with code along the following lines, using both a computed field and an edit box with the same code inside the repeat:
<xp:text escape="true" id="computedField9">
<xp:this.value><![CDATA[#{javascript:
//some calculations, nothing to see here*
var subTotal = viewScope.get("valueColumnTotal");
viewScope.put("valueColumnTotal", subTotal + sumVals);
sessionScope.put("Testing", sessionScope.get("Testing") + "~" + sumVals);
return sumVals;
}]]></xp:this.value>
//converters and stuff, nothing to see here
</xp:text>
<xp:inputText id="inputText1">
<xp:this.value><