I have a Test plan in which there are multiple Thread Groups.
I want to run all of the Thread Groups sequentially.
Thread Groups are as below:
Thread Group1
Thread Group2
Thread Group3
. . .
Thread GroupN
I've read in different blogs and articles on the internet, people claiming that the thread groups will run in the order they are defined but apparently they are not in my case. Thread Group4 runs before Thread Group1. Thread Group4 is generating a report which is wrong because it runs before Thread Group1.
How do I ensure the ordering of my Thread Groups?
Also, I need to implement the following scenarios:
Run a single request multiple time by a single user (Single user should create 1000 accounts from a single HTTP request).
Run a multiple requests multiple times by multiple users simultaneously (Multiple users should create 1000 accounts simultaneously from a single HTTP request).
How to do so?
PS: Please read and understand the query carefully before replying.