On my Kanban board project I have the option to add swimlanes on the Features where all the product backlog items are and another option on the Stories side. Which would be the approach of each of them and why should be their separate use.
For example, I have on my Feature option an Expedited lane, does it make sense to leave it there or that options is more a swimlane that belongs to the Stories option?
As you can see I can set as many swimlanes I need, I found useful to have for example one swimlane per project on the Features option if I suppose to work with more than one at the same time, but in the other hand it gets me confused because I have the same option on Stories